Commissioning load devices via challenge-response-timing

    公开(公告)号:US10284927B2

    公开(公告)日:2019-05-07

    申请号:US15768124

    申请日:2016-09-23

    Abstract: Commission devices (1) comprise first transmitters (11) for transmitting activation signals to load devices (2-6), and second transmitters (12) for transmitting numbers of challenge signals to activated load devices (2) that respond by sending back a response signal per challenge signal to the commission devices (1). The commission devices (1) further comprise first receivers (13) for receiving the response signals and controllers (14) for determining time-intervals present between transmissions of the challenge signals and receptions of the response signals. The controllers (14) derive absolute or relative positions of the load devices (2-6) from analyzes such as statistical analyzes of the time-intervals. Load devices (2-6) comprise second receivers (21) for receiving the activation signals and third receivers (22) for receiving the number of challenge signals and third transmitters (23) for sending back the response signals to the commission devices (1). The load devices (2-6) may further comprise loads (26).

    Problem detection for cable-fed-loads

    公开(公告)号:US10317441B2

    公开(公告)日:2019-06-11

    申请号:US15028436

    申请日:2014-10-08

    Abstract: A device (1) for detecting a problem in or near a load (2, 3) coupled to a cable (6) of a cable system comprises an analyzing part (11) for analyzing a waveform of a cable signal for feeding the load (2, 3) and a deciding part (12) for in response to an analysis result deciding whether a problem in or near the load (2, 3) is present or not. The load (2, 3) may be coupled to the cable (6) via a driver (4, 5). The problem in or near the load (2, 3) may result in the driver (4, 5) amending a value of the waveform at or near a crest or a trough of the waveform. The analysis result may define whether the waveform has been amended by more than a threshold or not. The amending of the value of the waveform at or near the crest or the trough may comprise a positive pulse added to a crest or a negative pulse added to a trough.

    Status derivation of load circuit via capacitance

    公开(公告)号:US10830831B2

    公开(公告)日:2020-11-10

    申请号:US15741306

    申请日:2016-06-17

    Abstract: Apparatuses (10) for determining statuses of load circuits (11) comprise terminals (1, 2) for exchanging current signals with current sources (12). The load circuits (11) comprise D loads (L1-LD) in series combinations coupled to the terminals (1, 2). The apparatuses (10) further comprise capacitance circuits (3) comprising E monitor capacitances (CM1-CME) with first contacts coupled to each other and to one of the terminals (1, 2) and second contacts coupled to interconnections between the loads (L1-LD). The apparatuses (10) further comprise detection circuits (4) for detecting voltage signals present between the first and second terminals (1, 2), and derivation circuits (5) for deriving the statuses of the load circuits (11) from the detected voltage signals. Thereto, the derivation circuits (5) may calculate instantaneous capacities comprising steps indicative for said statuses of the load circuits (11). The capacitance circuits (3) do advantageously not interfere with the load circuits (11) in steady-states, and may further comprise F parallel capacitances (CP1-CFP) in parallel to the loads (L1-LD).

Patent Agency Ranking