- Patent Title: Method for controlling hydraulic system of construction machinery
-
Application No.: US14778212Application Date: 2014-03-21
-
Publication No.: US09644651B2Publication Date: 2017-05-09
- Inventor: Yong Ho Tho , Woo Yong Jung
- Applicant: Doosan Infracore Co., Ltd.
- Applicant Address: KR Incheon
- Assignee: Doosan Infracore Co., Ltd.
- Current Assignee: Doosan Infracore Co., Ltd.
- Current Assignee Address: KR Incheon
- Agency: K&L Gates LLP
- Priority: KR10-2013-0030442 20130321
- International Application: PCT/KR2014/002381 WO 20140321
- International Announcement: WO2014/148855 WO 20140925
- Main IPC: F15B21/08
- IPC: F15B21/08 ; F15B11/04 ; F02D29/04 ; E02F9/22 ; F04B49/06

Abstract:
The method for controlling the hydraulic system of construction machinery according to the present disclosure includes an engine speed prediction step, in which a variable rated engine speed, which varies within a range larger than a fixed rated engine speed and smaller than a high idle engine speed for the fixed rated engine speed and a virtual engine speed, which is to be input later, are predicted to output a virtual engine speed value predicted before an actual engine speed is input. Accordingly, when an operation load is applied, pump torque may initially have a margin, and even though an engine speed is decreased due to the operation load, it is possible to prevent an engine speed decrease phenomenon in which the engine speed becomes remarkably smaller than the rated engine speed.
Public/Granted literature
- US20160061236A1 METHOD FOR CONTROLLING HYDRAULIC SYSTEM OF CONSTRUCTION MACHINERY Public/Granted day:2016-03-03
Information query