Invention Grant
US08239054B2 Manufacturing resource planning using a component management system 有权
使用组件管理系统制造资源规划

Manufacturing resource planning using a component management system
Abstract:
Order information is received for an order executable using a computer system to assemble a product from a plurality of components at a manufacturing location. A real-time record associated with the manufacturing location and being kept updated substantially in real time with order changes is updated with the order information, the real-time record associating the order with the plurality of components. For each of the plurality of components, it is determined whether a component change due to the order information meets a component-specific change criterion associated with the component. A static record is updated with the component change for any of the plurality of components required for the order where the component-specific change criterion is met. After the static record is updated, a management process configured to manage supply of at least one of the plurality of components according to the static record is initiated for the manufacturing location.
Information query
Patent Agency Ranking
0/0