Invention Grant
US08192129B1 Pipe handling boom pretensioning apparatus 有权
管道处理吊杆预张紧装置

Pipe handling boom pretensioning apparatus
Abstract:
A pre-loading system for a pipe handling apparatus in which a boom is pivotally mounted at one end to a skid and in which an arm is connected to an opposite end of the boom. The pre-loading system has a tensioning assembly with one end affixed to the arm and an opposite end fixedly mounted so as to apply tension to the arm when the arm has a load applied to an end of the arm opposite the boom. The tensioning assembly includes a first cable assembly having one end connected to the arm and an opposite end fixedly mounted, and a second cable assembly connected to the arm and having an opposite end fixedly mounted. The first and second cable assemblies extend from opposite sides of the arm.
Information query
Patent Agency Ranking
0/0