US07991633B2 System and process for job scheduling to minimize construction costs
有权
用于作业调度的系统和过程以最小化施工成本
- Patent Title: System and process for job scheduling to minimize construction costs
- Patent Title (中): 用于作业调度的系统和过程以最小化施工成本
-
Application No.: US10014919Application Date: 2001-12-11
-
Publication No.: US07991633B2Publication Date: 2011-08-02
- Inventor: Andrew B. Baker , Matthew L. Ginsberg , Tristan Smith , Daniel B. Keith , Andrew Parkes , Bryan Smith
- Applicant: Andrew B. Baker , Matthew L. Ginsberg , Tristan Smith , Daniel B. Keith , Andrew Parkes , Bryan Smith
- Applicant Address: US OR Eugene
- Assignee: On Time Systems, Inc.
- Current Assignee: On Time Systems, Inc.
- Current Assignee Address: US OR Eugene
- Agency: Fenwick & West LLP
- Main IPC: G06Q40/00
- IPC: G06Q40/00

Abstract:
Increased efficiency and lower cost job scheduling is provided by a system and method that optimizes for cost instead of makespan, and minimizes fluctuations in resource utilization. A schedule is constructed using a workflow scheduling system that includes a load leveler, a cost minimizer, and a manpower planner. The load leveler minimizes makespan, subject to resource limits, and then lowers the resource limits, repeating the process in order to create a flatter schedule. The cost minimizer generates an initial solution, and then incrementally improves it, using the manpower planner to evaluate the different possible solutions. The manpower planner calculates, for a given schedule, the optimal hire/fire decisions to minimize total cost.