Invention Grant
- Patent Title: Generalized well management in parallel reservoir simulation
- Patent Title (中): 平行油藏模拟中的广义井管理
-
Application No.: US10966971Application Date: 2004-10-15
-
Publication No.: US07809537B2Publication Date: 2010-10-05
- Inventor: Kesavalu Hemanthkumar , Henry H. Hoy , William Thomas Dreiman , Usuf Middya
- Applicant: Kesavalu Hemanthkumar , Henry H. Hoy , William Thomas Dreiman , Usuf Middya
- Applicant Address: SA Dhahran
- Assignee: Saudi Arabian Oil Company
- Current Assignee: Saudi Arabian Oil Company
- Current Assignee Address: SA Dhahran
- Agency: Bracewell & Giuliani LLP
- Main IPC: G06G7/50
- IPC: G06G7/50 ; G06G7/48 ; G06G7/62 ; G06G7/66 ; G05B13/02 ; G05B13/04

Abstract:
A computer-implemented process simulates production of oil and gas from hydrocarbon reservoirs. The process is used to help forecast the optimal future oil and gas recovery from large hydrocarbon reservoirs. At the same, this process is flexible to allow for further addition of new options; robust and reliable; and easy to use. The process is also comprehensive in that it allows a forecast of future performance of a wide range of reservoirs and future operation scenarios. By using the high-resolution models provided, a reservoir can be described much more accurately.
Public/Granted literature
- US20060085174A1 Generalized well management in parallel reservoir simulation Public/Granted day:2006-04-20
Information query