Method for back end planning and scheduling
Abstract:
Embodiments presented herein provide techniques for planning and scheduling in a factory. The technique begins by generating a bottleneck loading plan from a plurality of inputs. A simulation is run using the bottleneck loading plan. The factory is simulated using decisions made based on the bottleneck loading plan and a lot-to-machine schedule is generated with the simulation bottleneck loading plan.
Public/Granted literature
Information query
Patent Agency Ranking
0/0