Method and apparatus for peak switching to reduce losses in high frequency DC-DC converters
Abstract:
A method includes monitoring a resonant interval across a switching node. The method also includes detecting one or more preset values associated with the resonant interval across the switching node. The method further includes, in response to detecting the one or more preset values associated with the resonant interval across the switching node, initiating a high switch into an “on” operation.
Information query
Patent Agency Ranking
0/0