Building control systems with optimization of equipment life cycle economic value while participating in IBDR and PBDR programs
Abstract:
A central plant includes an electrical energy storage subplant configured to store electrical energy, a plurality of generator subplants configured to consume one or more input resources, including discharged electrical energy, and a controller. The controller is configured to determine, for each time step within a time horizon, an optimal allocation of the input resources. The controller is configured to determine optimal allocation of the output resources for each of the subplants in order to optimize a total monetary value of operating the central plant over the time horizon.
Information query
Patent Agency Ranking
0/0